Food Processing, Canning and Pouch Filling Plant Expansion, Henderson, Auckland

Design/build working from plans and concepts.  The job involved the removal of old pipe work and replacing with new pipe work as outlined below:

  • Steam ASME 9 – stainless and carbon
  • Chilled water to cooling towers – dairy tube 4703 standard
  • Product lines – dairy tube 4703 standard
  • Air stainless press fit
  • Potable water – dairy tube 4703 standard
  • Conduit – dairy tube

Pipe Welding Services was involved in the full construction/re-construction of the plant and the placing of machinery, conveyors, pumps, heat exchanges etc to get the new plant operational.