Recently Completed Projects

Food Processing, Canning and Pouch Filling Plant Expansion, Henderson, Auckland

Design/build working from plans and concepts.  The job involved the removal of old pipe work and replacing with new pipe work as outlined below:

Krones

Working with German engineers to construct a carbonation plant in Northland.

Gopala Yoghurt Plant

Construction of a new yoghurt plant for Gopala Yoghurt. This project involved working with the Engineer to design and construct the plant.

Replacement Water Main – Fonterra Brands Tip Top Site, Mt Wellington

This project involved installing a new water main, testing, hooking up cut overs and removal of the old pipe work (approx. 300m).

Refrigeration/Ammonia Upgrade – Fonterra Brands Tip Top Site, Mt Wellington

This 12 month contract was to completely upgrade the Ammonia refrigeration plant in stainless steel ½” to 8” sch pipe.

Hot Water Ring Main – Fonterra Brands Tip Top Site, Mt Wellington

This project involved supplying new stainless steel hot water tube to product/washdown stations throughout the factory, working closely with the engineers to find the most practical route.

New Jacketed Chocolate Pipe – Fonterra Brands Tip Top Site, Mt Wellington

This six week project involved running a new jacketed pipe, return line and brackets to a new chocolate tank. There were no existing pipes in place so we liaised with the Fonterra engineer to establish the best route to run the pipes.

Bird Aviary – Auckland Zoo (Ban Trans)

Worked closely with the client to design, install and construct the structure. We installed the main pipe and supports to the existing wooden structure.