Refrigeration/Ammonia Upgrade – Fonterra Brands Tip Top Site, Mt Wellington

This 12 month contract was to completely upgrade the Ammonia refrigeration plant in stainless steel ½” to 8” sch pipe.

We were provided with scematic drawings at the start of the project. All measuring and fabrication was done on site by Pipe Welding Services.

Leave a Reply

Your email address will not be published. Required fields are marked *