Replacement Water Main – Fonterra Brands Tip Top Site, Mt Wellington

This project involved installing a new water main, testing, hooking up cut overs and removal of the old pipe work (approx. 300m).

Pipe Welding Services worked closely with the Fonterra engineer to design a bracketing system to support the load of the pipe.

We used the Grinnell piping system.

Leave a Reply

Your email address will not be published. Required fields are marked *